Add a Portable Toilet Line When No Bathroom Works
The plan is to gut both bathrooms in week one, and the crew needs somewhere to go. The budget has no line for a rental. Adding one takes three minutes. The question is how likely a portable toilet is to be needed and unbudgeted for the line to pay.
The steps
- Price the step: minutes × the value of your time.
- Price a missing line: a rental not in the budget.
- Break-even chance = step cost ÷ rental cost.
- Budget for debris too (dumpsters and debris budget before demolition).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 3 minutes at $60 an hour: $3. A missing rental line costs $150. Every figure is a made-up round number.
| Chance a rental is needed and unbudgeted | Expected cost avoided (chance × $150) | Avoided − $3 |
|---|---|---|
| 1% | $1.50 | −$1.50 |
| 2% | $3 | $0 (break-even) |
| 6% | $9 | +$6 |
| 10% | $15 | +$12 |
The step pays at a 2% chance of an unbudgeted rental: $3 ÷ $150. When the bathrooms are gutted early, it is easily exceeded.
Check the plan for weeks with no bathroom, get a rental quote and add it to the budget.
Making it routine
- Check the plan for weeks with no bathroom.
- Get a rental quote.
- Add it to the budget.
- Ask the building department about site rules.