Security
This page describes the security controls in our products: DeskTech Deals, DeskTech Lending, and Rights Restore. It lists what is in place now. This is not a certification.
Last updated Nov 10, 2026.
Where our products run
Our products run on Render. Traffic goes through Cloudflare. Our sites and apps are served over HTTPS, and they tell browsers to always use HTTPS (HSTS).
Our databases are managed Postgres on Render. Render encrypts these databases at rest with AES-256, including backups.
Keeping each customer's data separate
Each company, lender, or law firm has its own workspace. The apps tie each request to that customer's workspace and limit what it can read or change to that workspace's records.
Rights Restore also enforces this in the database with row-level security. A request not tied to the right workspace sees no rows.
Passwords and sign-in
We never store passwords in plain text. They are stored as one-way hashes: bcrypt in Deals, PBKDF2 in Lending, and scrypt in Rights Restore.
In all three products, repeated failed sign-in attempts are slowed down or locked out for a time.
- Rights Restore: two-step sign-in with an authenticator app is required for law-firm users and our staff.
- DeskTech Lending: lender staff can turn on two-step sign-in with an authenticator app or a passkey. This is optional.
- DeskTech Deals: two-step sign-in is not available yet.
Sessions
Lending and Rights Restore use sign-in cookies that scripts on the page cannot read and that are only sent over HTTPS. Both sign you out after a period of inactivity. In Deals, changing your password signs out your other sessions.
Roles and permissions
Each product has roles, and access is limited by role. For example, Deals has owner, admin, member, and analyst roles. Rights Restore has firm admin, attorney, paralegal, and reviewer roles.
Extra encryption for sensitive information
- DeskTech Lending encrypts borrower Social Security numbers, EINs, and dates of birth in the database.
- Rights Restore encrypts uploaded files and sensitive case details, such as conviction details and personal statements, before saving them.
- DeskTech Deals encrypts the access keys for apps you connect, such as QuickBooks.
Activity logs
- DeskTech Lending records each signed-in action: who did it, which page, when, and from what IP address. Passwords and secret links are never written to the log.
- Rights Restore keeps an audit log that can only be added to, not edited or deleted. Each entry is linked to the one before it so gaps can be detected.
- DeskTech Deals does not have a general activity log yet.
Payments
Card payments go through our payment processor's hosted checkout page. You enter your card on that page, not on ours, and we never see or store your full card number.
Backups
Each product's live database is on a paid Render Postgres plan with Render's automatic backups and point-in-time recovery. Deals has a written restore plan. Rights Restore's automated tests back up and restore a test database on every code change.
What we don't have yet
We don't currently hold a SOC 2 report, and we haven't had an outside penetration test. Security questionnaires are available on request.
Questions or a security concern
Email partners@desktechhq.com. If you think you've found a security problem, please tell us there and we'll respond.