Privacy
Cookies, the Meta Pixel and campaign attribution
This section explains what desktechhq.com records about your visit, why, and how to opt out.
Meta Pixel
We may use the Meta Pixel, a tool provided by Meta Platforms, Inc., to measure how our ads on Facebook and Instagram perform. When it is turned on, your browser loads a script from Meta that tells Meta which pages of this site you view, which of our buttons you click (for example “Start free trial”), when you use one of our calculators, and when one of our forms is submitted successfully, along with which product it was about (DeskTech Deals or DeskTech Lending).
Meta receives that information directly from your browser, together with technical details such as your IP address, browser type and identifiers stored in Meta cookies, and may connect it to your Meta account. Meta handles that information under its own privacy policy.
We do not send Meta your name, email address, phone number, company or anything you type into a form, and we do not use Meta’s advanced matching.
Campaign attribution cookies
To know which ad, email or website brought you to us, our site stores two first-party cookies in your browser, dt_ft (your first visit) and dt_lt (your most recent visit from a campaign or another website). Each is kept for 90 days. They are set by this site, not by Meta or Google, and they hold:
- the campaign details in the link you followed (utm_source, utm_medium, utm_campaign, utm_content and utm_term);
- the ad click identifiers Google and Meta add to ad links (gclid and fbclid);
- the page of this site you first landed on, the website that referred you, if any, and the time of your first visit.
When you send us a form
When you submit a form on this site, the campaign details above are sent along with what you entered, so we can see which campaign brought you. We receive your submission by email and may store it, including those campaign details, in our customer relationship management (CRM) system so we can follow up on your request. Our site also uses your browser’s session storage to avoid counting the same submission twice.
How to opt out
- Global Privacy Control or Do Not Track: if your browser sends either signal, the Meta Pixel does not load on this site and no information is sent to Meta from it.
- Browser settings: you can block or delete cookies and site data, including our dt_ft and dt_lt cookies and Meta’s cookies, in your browser’s settings. Our forms still work without them.
- Meta: you can control how Meta uses information from other websites to show you ads in your Meta ad preferences.
- Questions or requests about your information: contact us.