Ask for the Contractor's License Number at Application
Midway through the rehab the lender learns the contractor was never licensed for the work. Asking for the license number at application and looking it up takes four minutes. The question is how likely an unlicensed contractor is to cause trouble for the step to pay.
The steps
- Price the step: minutes × the value of your time.
- Price an unlicensed contractor: a stalled project, a lien problem or a difficult claim.
- Break-even chance = step cost ÷ trouble cost.
- Check references too (ask for contractor references and call two).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 4 minutes at $60 an hour: $4. An unlicensed contractor causes $2,000 of trouble. Every figure is a made-up round number.
| Chance of an unlicensed-contractor problem | Expected cost avoided (chance × $2,000) | Avoided − $4 |
|---|---|---|
| 0.1% | $2 | −$2 |
| 0.2% | $4 | $0 (break-even) |
| 0.6% | $12 | +$8 |
| 1% | $20 | +$16 |
The step pays at a 0.2% chance of an unlicensed-contractor problem: $4 ÷ $2,000. With several borrowers and contractors, it is easily exceeded.
Ask for the license number at application, look it up on the state board’s site and note the date you checked.
Making it routine
- Ask for the license number at application.
- Look it up on the state board’s site.
- Note the date you checked.
- Ask a lawyer what your state requires.
Run your own numbers
Use the free fix-and-flip loan sizer below to size each loan once the contractor checks out.