Hold the Trim and Door Order Until Sizes Are Confirmed
The doors arrive and three of them are the wrong size. Special orders cannot go back, and the crew waits. Asking that the order be held until the openings are measured and the sizes are on a list takes four minutes. The question is how likely a wrong-size order is for the step to pay.
The steps
- Price the step: minutes × the value of your time.
- Price a wrong-size order: return fees, reorders and days waiting for the right parts.
- Break-even chance = step cost ÷ order cost.
- Keep a weekly update going (a weekly two-line status text).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 4 minutes at $60 an hour: $4. A wrong-size order costs $400 in fees and delay. Every figure is a made-up round number.
| Chance of a wrong-size order | Expected cost avoided (chance × $400) | Avoided − $4 |
|---|---|---|
| 0.5% | $2 | −$2 |
| 1% | $4 | $0 (break-even) |
| 3% | $12 | +$8 |
| 5% | $20 | +$16 |
The step pays at a 1% chance of a wrong-size order: $4 ÷ $400. With special-order trim and doors, it is easily exceeded.
Ask for the openings to be measured and the sizes written on a list before anything is ordered, and check the list against the order.
Making it routine
- Ask for the openings to be measured first.
- Have the sizes written on a list.
- Check the list against the order.
- Ask the supplier about special-order returns.