Ask the Seller for Major Repair Records: The Odds

By DeskTech HQ · · 1 min read

A seller who replaced the roof or the furnace usually has an invoice. One who did not will have nothing. Asking for records takes ten minutes. The question is how likely the answer is to change what you think a system is worth for the request to pay.

The steps

  1. Price the request: minutes × the value of your time.
  2. Estimate the cost of a system that is older than you assumed.
  3. Break-even chance = cost ÷ that cost.
  4. Verify with your inspection (pricing an old roof).

A worked example

Example (illustrative arithmetic, not predictions)

The request takes 10 minutes at $60 an hour: $10. A system older than assumed would cost $2,500 to replace early. Every figure is a made-up round number.

Chance the records show an older system Expected loss avoided (chance × $2,500) Avoided − $10
0.2% $5 −$5
0.4% $10 $0 (break-even)
1% $25 +$15
3% $75 +$65

The request pays at a 0.4% chance of an older system: $10 ÷ $2,500. In a house that has changed hands, that is likely exceeded.

Ask for invoices, permits and warranties for the roof, heating and cooling, water heater, plumbing and electrical. A claimed replacement with no paper deserves the same price as an old one until the inspector says otherwise.

Making it routine

  1. Ask for invoices, permits and warranties.
  2. Compare them with the inspector’s findings.
  3. Price systems without records as old.
  4. Check permits with the building department.

Run your own numbers

Use the free MAO calculator below to see how an early replacement changes the most you can offer.

Quick answers

What records help?

Invoices and permits for the roof, heating, water heater, plumbing and electrical work.

How do I price the request?

The minutes to ask and read the records.

What is the break-even chance?

The cost divided by the cost of a system you thought was newer.

What if there are no records?

That is information. Price the system as if it were old.

Do the numbers in this guide apply to my deal?

No. The cost, loss and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read
Deal analysis

Ask for the Insurance Claims History: The Odds

Learn how to price asking a seller for a property's insurance claims history before you offer and find the chance of a hidden past claim that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.