Ask the Tenant for the Best Times for Repair Visits
The handyman arrives on Tuesday at ten and nobody is home. A question in the welcome message about the best times for visits takes two minutes to add. The question is how likely a failed-access visit is for the line to pay.
The steps
- Price the line: minutes × the value of your time.
- Price a failed visit: a trip where nobody could let the crew in.
- Break-even chance = line cost ÷ visit cost.
- Make requests easy (tenant portal for maintenance requests).
A worked example
Example (illustrative arithmetic, not predictions)
The line takes 2 minutes at $60 an hour: $2. A failed visit costs $50. Every figure is a made-up round number.
| Chance of a failed visit | Expected cost avoided (chance × $50) | Avoided − $2 |
|---|---|---|
| 2% | $1 | −$1 |
| 4% | $2 | $0 (break-even) |
| 8% | $4 | +$2 |
| 12% | $6 | +$4 |
The line pays at a 4% chance of a failed visit: $2 ÷ $50. Over many visits, it is plausible.
Ask for the best days and hours, record them with the lease and still give the notice the law and lease require.
Making it routine
- Ask for the best days and hours.
- Record them with the lease.
- Still give the notice the law and lease require.
- Check local entry rules.
Run your own numbers
Use the free BRRRR calculator below to see how repair trips affect your returns on a hold.