Ask the Tenant to Send Photos With Every Maintenance Request
A tenant reports a leak in the bathroom. The handyman arrives without the part and has to come back. One or two photos with the request would have shown it. A line in the welcome message takes two minutes to add. The question is how likely a second visit is for the line to pay.
The steps
- Price the line: minutes × the value of your time.
- Price a second visit: a return trip because the first visit lacked the part or the person.
- Break-even chance = line cost ÷ visit cost.
- Make requests easy (tenant portal for maintenance requests).
A worked example
Example (illustrative arithmetic, not predictions)
The line takes 2 minutes at $60 an hour: $2. A second visit costs $80. Every figure is a made-up round number.
| Chance of a second visit | Expected cost avoided (chance × $80) | Avoided − $2 |
|---|---|---|
| 1.25% | $1 | −$1 |
| 2.5% | $2 | $0 (break-even) |
| 5% | $4 | +$2 |
| 10% | $8 | +$6 |
The line pays at a 2.5% chance of a second visit: $2 ÷ $80. Over many requests, it is easily exceeded.
Ask for a photo or two with every request, say emergencies need a call and add it to the welcome message.
Making it routine
- Ask for a photo or two with every request.
- Say that emergencies need a call, not a photo.
- Add it to the welcome message.
- Check local rules on repair timelines.
Run your own numbers
Use the free BRRRR calculator below to see how repair trips affect your returns on a hold.