Bank Feed or Manual Entry? The Transactions That Cross
Every payment, draw and fee has to get into the books. Typing each one takes a minute or two. A bank feed imports them for a monthly fee. The two cross at a transaction count.
The steps
- Cost one manual entry: minutes × your hourly value.
- Get the feed’s monthly fee.
- Crossing transactions a month = feed fee ÷ cost per entry.
- Compare with the transactions you record (reconciling the monthly ledger).
A worked example
Example (illustrative arithmetic, not quotes)
One entry takes 1.5 minutes at $40 an hour, $1.00. The feed costs $30 a month. Every figure is a made-up round number.
| Transactions a month | Manual entry (n × $1) | Feed | Cheaper |
|---|---|---|---|
| 15 | $15 | $30 | Manual, by $15 |
| 30 | $30 | $30 | Even |
| 80 | $80 | $30 | Feed, by $50 |
The feed wins above thirty transactions a month: $30 ÷ $1. A lender with five loans may record twenty. One with thirty loans records far more.
A feed does not do the checking. Imported transactions still need to be matched to loans and reconciled, and miscategorized items still need review. Treat the feed as a way to save typing, not a substitute for reconciliation (servicing software: flat or per loan).
Making it routine
- Count transactions a month.
- Time a manual entry.
- Compute the crossing count.
- Review the vendor’s data terms before connecting.
Run your own numbers
Use the free fix-and-flip loan sizer below to see the servicing cost that sits behind each loan.