Bathroom Exhaust Fan: The Mold Odds That Pay for $180

By DeskTech HQ · · 1 min read

Showers put moisture into a bathroom. A weak or unvented fan leaves it there, and it can end up on walls, in the ceiling and in the attic. A new fan costs little. The question is how likely a mold problem has to be for the fan to pay.

The steps

  1. Take the cost of a fan installed, vented outdoors.
  2. Estimate the cost of remediation and repair if mold takes hold.
  3. Break-even chance = fan cost ÷ remediation cost.
  4. Check the fan at each turnover (mold testing before an offer).

A worked example

Example (illustrative arithmetic, not predictions)

The fan costs $180 installed. Remediation and repair would cost $4,500. Every figure is a made-up round number.

Chance of a mold problem without the fan Expected cost avoided (chance × $4,500) Avoided − $180
1% $45 −$135
4% $180 $0 (break-even)
10% $450 +$270

The fan pays at a 4% chance of a mold problem: $180 ÷ $4,500. In a windowless bathroom with heavy use and a fan that vents into the attic, the chance is higher than that.

Check the fan, not just the price. A fan that vents into the attic or the wall cavity moves the moisture, it does not remove it. A fan sized too small for the room does little. And a bathroom with a mold problem already needs the source found and fixed before anything else (dryer vent cleaning).

Making it routine

  1. Test each bathroom fan at turnover.
  2. Make sure fans vent outdoors.
  3. Compute the break-even chance.
  4. Replace weak fans, and fix moisture at the source.

Run your own numbers

Use the free BRRRR calculator below to see what a mold repair does to a rental’s cash flow.

Quick answers

What is the break-even chance?

The cost of the fan divided by the cost of the mold problem it prevents.

How do I know the fan is weak?

Tissue test, steamed mirrors that stay fogged, or a fan that does not vent outside.

Does the fan have to vent outdoors?

It should. Venting into an attic can create the problem.

Who is responsible for moisture and mold?

It depends on the lease and state. Landlords often have duties.

Do the numbers in this guide apply to my rental?

No. The cost and odds are made up for the example. They are not predictions.

Keep reading

BRRRR

Eviction Protection Plan: The Eviction Odds

Learn how to find the chance of an eviction that makes a $240 a year eviction protection plan pay for itself on a rental, with simple arithmetic.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.