Cover Registers With Plastic During Drywall Dust
The crew sands drywall with the return open. Dust is drawn into the ducts and settles in every room. Plastic over each opening costs about fifteen dollars and fifteen minutes. The question is how likely a duct cleaning is for the covers to pay.
The steps
- Price the covers: plastic and tape + minutes × the value of your time.
- Price a duct cleaning: a visit and sometimes a filter.
- Break-even chance = cover cost ÷ cleaning cost.
- Check the registers afterward (vacuum and check every register at turnover).
A worked example
Example (illustrative arithmetic, not predictions)
The covers cost $5 of plastic and tape plus 15 minutes at $60 an hour ($15): $20. A duct cleaning costs $400. Every figure is a made-up round number.
| Chance a duct cleaning is needed | Expected cost avoided (chance × $400) | Avoided − $20 |
|---|---|---|
| 2.5% | $10 | −$10 |
| 5% | $20 | $0 (break-even) |
| 10% | $40 | +$20 |
| 15% | $60 | +$40 |
The covers pay at a 5% chance that a duct cleaning is needed: $20 ÷ $400. In a house with the system left on, it is plausible.
Switch the system off, tape plastic over every register and return, seal around the edges, and take it down before the system runs. Give workers masks and eye protection.
Making it routine
- Switch the system off.
- Tape plastic over every register and return.
- Remove it before the system runs.
- Give workers masks and eye protection.
Run your own numbers
Use the free holding cost calculator below to see what a day of delay for a cleaning costs on your own flip.