End-of-Day Lock-Up Photo From the Crew: The Odds

By DeskTech HQ · · 1 min read

The crew leaves at four. One day the back door is pulled shut but not latched. Overnight, tools walk out or rain blows in. A photo of the locked door takes two minutes a day. The question is how likely an open-door night is, per day, for the photo to pay.

The steps

  1. Price the photo: minutes × the value of your time, per day.
  2. Price an open-door night: loss and cleanup.
  3. Break-even daily chance = daily cost ÷ loss.
  4. Pair it with keys (keep a key log for every flip).

A worked example

Example (illustrative arithmetic, not predictions)

The photo takes 2 minutes at $60 an hour: $2 a day. An open-door night costs $600. Every figure is a made-up round number.

Daily chance of an unlocked night Expected cost avoided (chance × $600) Avoided − $2
0.17% $1 −$1
0.33% $2 $0 (break-even)
1% $6 +$4
2% $12 +$10

The photo pays at a 0.33% daily chance of an unlocked night, about one in 300 days: $2 ÷ $600. Over a flip with several trades, it is plausible.

Ask the last person out to photograph the locked door and the windows and text it. Keep the photos with the project file. A photo is a prompt, not a lock.

Making it routine

  1. Ask the last person out to send a photo.
  2. Include the door and windows.
  3. Keep the photos in the project file.
  4. Check your insurance conditions.

Run your own numbers

Use the free holding cost calculator below to see what a delay from a loss adds to the cost of a flip.

Quick answers

What is a lock-up photo?

A phone photo of the locked door and closed windows at the end of the day.

How do I price it?

The minutes per day times the value of your time.

What does an open-door night cost?

Stolen tools or materials and weather damage.

What is the break-even chance?

The daily cost divided by the open-door cost.

Do the numbers in this guide apply to my flip?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Ask for a Photo of Each Delivered Material Pallet

Learn how to price asking the contractor for a photo of each delivered material pallet and find the short-shipment chance at which two minutes pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.