Keep a Stocked First-Aid Kit on the Flip Site: The Odds

By DeskTech HQ · · 1 min read

Someone cuts a hand on a sheet of drywall. The nearest bandage is a drive away, and the half-day is gone. A stocked kit costs about twenty-five dollars and takes five minutes to place. The question is how likely a minor-injury delay is for the kit to pay.

The steps

  1. Price the kit: kit + minutes × the value of your time.
  2. Price a minor-injury delay: a lost half-day.
  3. Break-even chance = kit cost ÷ delay cost.
  4. Put the hospital address on the sheet (contact sheet inside the kitchen cabinet).

A worked example

Example (illustrative arithmetic, not predictions)

The kit costs $25 plus 5 minutes at $60 an hour ($5): $30. A minor-injury delay costs $200 in lost time. Every figure is a made-up round number.

Chance of a minor-injury delay Expected cost avoided (chance × $200) Avoided − $30
7.5% $15 −$15
15% $30 $0 (break-even)
30% $60 +$30
50% $100 +$70

The kit pays at a 15% chance of a minor-injury delay: $30 ÷ $200. Over a flip with several trades, that is plausible.

Keep the kit where everyone can find it, check it at each visit and replace what is used. For anything serious, call emergency services first.

Making it routine

  1. Keep the kit where everyone can find it.
  2. Check it at each visit.
  3. Replace what is used.
  4. Call emergency services for serious injuries.

Run your own numbers

Use the free holding cost calculator below to see what a lost half-day costs on your own flip.

Quick answers

What goes in a kit?

Bandages, gauze, tape, antiseptic wipes, eye wash and gloves.

How do I price it?

The kit plus the minutes to place and check it.

What does a minor injury delay cost?

A lost half-day while someone leaves to find supplies.

What is the break-even chance?

The kit's cost divided by the cost of the delay.

Do the numbers in this guide apply to my flip?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Ask for a Photo of Each Delivered Material Pallet

Learn how to price asking the contractor for a photo of each delivered material pallet and find the short-shipment chance at which two minutes pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.