Partner Calls: One Group Call or Individual Calls?
Capital partners like to hear from the lender. A call with each partner takes time. A single group call takes more preparation but covers everyone at once. The two cross at a partner count.
The steps
- Cost the group call: preparation plus call time.
- Cost one individual call.
- Crossing partners = group call cost ÷ individual call cost.
- Compare with your partner count (monthly partner updates).
A worked example
Example (illustrative arithmetic, not benchmarks)
A group call takes 2.5 hours with preparation, $100 at $40 an hour. An individual call takes 20 minutes, $13.33. Every figure is a made-up round number.
| Partners | Individual calls (n × $13.33) | Group call | Cheaper |
|---|---|---|---|
| 4 | $53 | $100 | Individual, by $47 |
| 7.5 | $100 | $100 | Even |
| 12 | $160 | $100 | Group, by $60 |
The group call wins above seven and a half partners: $100 ÷ $13.33. A small pool does better with individual calls. A larger one with a group call.
Time is not the only point. Information should reach everyone alike, which is a reason to prefer a group call or a written update after any individual call that produced something new. A partner who hears important news first, by phone, is a problem waiting to happen (the annual letter).
Making it routine
- Plan one group call a year, plus the written reports.
- Offer individual calls for questions that are personal.
- Compute the crossing partner count.
- Send material news to all partners alike.
Run your own numbers
Use the free fix-and-flip loan sizer below to see the spread a loan earns on partner money.