Photograph Every Room After the Final Clean for the Record

By DeskTech HQ · · 1 min read

The buyer’s agent says the house was dirty at the final walk-through and asks for a credit. You cleaned it two days earlier but have no photos. A set of photos right after the final clean takes twelve minutes. The question is how likely an it-was-clean dispute is for the photos to pay.

The steps

  1. Price the photos: minutes × the value of your time.
  2. Price an it-was-clean dispute: time, a credit or a re-clean.
  3. Break-even chance = photo cost ÷ dispute cost.
  4. Plan the clean (mid-project cleanups vs. one final clean).

A worked example

Example (illustrative arithmetic, not predictions)

The photos take 12 minutes at $60 an hour: $12. An it-was-clean dispute costs $400. Every figure is a made-up round number.

Chance of an it-was-clean dispute Expected cost avoided (chance × $400) Avoided − $12
1.5% $6 −$6
3% $12 $0 (break-even)
6% $24 +$12
10% $40 +$28

The photos pay at a 3% chance of an it-was-clean dispute: $12 ÷ $400. With a buyer’s final walk-through, it is plausible.

Photograph each room after the final clean with the date on the files, lock the house after and keep the set with the closing file. Re-check just before the walk-through if the house sat empty.

Making it routine

  1. Photograph each room after the final clean.
  2. Date the files.
  3. Lock the house afterward.
  4. Re-check just before the walk-through.

Run your own numbers

Use the free holding cost calculator below to see what a day of closing delay costs on your own flip.

Quick answers

What is photographed?

Each room and the main surfaces, with dates, once the final clean is done.

How do I price it?

The minutes times the value of your time.

What does an it-was-clean dispute cost?

Time, a credit or a re-clean demanded before closing.

What is the break-even chance?

The photos' cost divided by that cost.

Do the numbers in this guide apply to my flip?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Ask for a Photo of Each Delivered Material Pallet

Learn how to price asking the contractor for a photo of each delivered material pallet and find the short-shipment chance at which two minutes pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.