Print the Report in Black and White Once Before Sending
A report arrives with a red-and-green status column. An investor prints it on a gray printer and every cell looks the same. A black-and-white test print takes five minutes. The question is how likely an unreadable printout is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Price an unreadable printout: a resend and a call.
- Break-even chance = check cost ÷ cost of an unreadable printout.
- Check the phone view too (open the report on a phone before sending).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 5 minutes at $60 an hour: $5. An unreadable printout costs $25 to fix. Every figure is a made-up round number.
| Chance of an unreadable printout | Expected cost avoided (chance × $25) | Avoided − $5 |
|---|---|---|
| 10% | $2.50 | −$2.50 |
| 20% | $5 | $0 (break-even) |
| 40% | $10 | +$5 |
| 60% | $15 | +$10 |
The check pays at a 20% chance of an unreadable printout in a report cycle: $5 ÷ $25. With color-coded tables, it is plausible.
Print one page in black and white, check that status columns and chart lines still read, and add a word or symbol next to any color. Keep a digital version for readers who need it.
Making it routine
- Print one page in black and white.
- Check status columns and charts.
- Add a word or symbol next to any color.
- Keep a digital version.
Run your own numbers
Use the free fix-and-flip loan sizer below to have your figures ready for each report.