Put the Headline Number in the First Line of the Email
An investor opens the report email and has to scroll to find out whether anything changed. Then they call. A one-line headline at the top takes ten minutes to build into your template. The question is how many how-are-we-doing calls it must prevent to pay.
The steps
- Price the setup: minutes × the value of your time.
- Price a how-are-we-doing call: minutes to answer.
- Break-even calls = setup cost ÷ call cost.
- Pair it with a standard subject (standard subject line for investor emails).
A worked example
Example (illustrative arithmetic, not benchmarks)
The setup takes 10 minutes at $60 an hour: $10. A how-are-we-doing call costs $5 to answer. Every figure is a made-up round number.
| Calls prevented in a year | Cost avoided (calls × $5) | Avoided − $10 |
|---|---|---|
| 1 | $5 | −$5 |
| 2 | $10 | $0 (break-even) |
| 4 | $20 | +$10 |
| 8 | $40 | +$30 |
The line pays if it prevents 2 calls a year: $10 ÷ $5. With many investors, that is ordinary.
Write one plain sentence with the result and the date, such as what was paid and whether anything is late. Keep it consistent with the report below it, and do not leave out bad news.
Making it routine
- Write one plain sentence at the top.
- Include the date.
- Keep it consistent with the report.
- Do not leave out bad news.
Run your own numbers
Use the free fix-and-flip loan sizer below to have your headline figures ready for each report.