Scan the Signed Note at Closing: The Lost-Note Odds

By DeskTech HQ · · 1 min read

The signed note is the lender’s main proof of the debt. Paper gets lost in moves, floods and filing errors. A scan at closing takes five minutes. The question is how likely a lost or damaged original is for the scan to pay.

The steps

  1. Price the scan: minutes × the value of your time.
  2. Estimate the cost of a lost original: legal work and delay.
  3. Break-even chance = cost ÷ lost-note cost.
  4. Compare with how long you hold originals (recording on the same day).

A worked example

Example (illustrative arithmetic, not predictions)

The scan takes 5 minutes at $60 an hour: $5. A lost original would cost $1,000 in legal work. Every figure is a made-up round number.

Chance the original is lost or damaged Expected cost avoided (chance × $1,000) Avoided − $5
0.25% $2.50 −$2.50
0.5% $5.00 $0 (break-even)
2% $20.00 +$15.00
5% $50.00 +$45.00

The scan pays at a 0.5% chance of a lost original: $5 ÷ $1,000. That is a low bar for a document this important.

A scan is a backup, not a replacement. Keep the original in a safe place, log where it is and who has it, and store the scan where it will survive the same fire. Ask a lawyer how your state treats copies and lost notes.

Making it routine

  1. Scan each note at closing.
  2. Store the original safely and log its location.
  3. Keep the scan in a separate place.
  4. Ask a lawyer about lost-note rules.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the balance a lost note would put at risk.

Quick answers

Why scan the note?

A copy helps if the original is lost, damaged or misfiled.

How do I price the scan?

The minutes per loan times the value of your time.

What does a lost note cost?

Legal work to prove the debt without the original.

Does a scan replace the original?

No. Keep the original safe too.

Do the numbers in this guide apply to my loans?

No. The time, cost and odds are made up for the example. They are not predictions.

Keep reading

Loan servicing

Annual Borrower Contact Update: The Odds That Pay

Learn how to price a ten-minute yearly check of each borrower's phone, email and address and find the chance of lost contact that makes it pay for itself.

· 2 min read
Loan servicing

Borrower Contact Log: Two Minutes Per Call

Learn how to price writing down every borrower call and email in a short log and find the dispute chance at which two minutes per contact pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.