Send Payment Instructions by a Secure Link, Not Plain Email
A borrower gets an email that looks like yours with new wire instructions and sends a payoff to a stranger. A secure link that always shows the current instructions takes ten minutes to set up. The question is how likely a misdirected payment is for the link to pay.
The steps
- Price the setup: minutes × the value of your time.
- Price a misdirected payment: money that may not come back and the cleanup.
- Break-even chance = setup cost ÷ misdirected-payment cost.
- Follow wire safeguards (wire fraud prevention for lenders).
A worked example
Example (illustrative arithmetic, not predictions)
The setup takes 10 minutes at $60 an hour: $10. A misdirected payment costs $3,000. Every figure is a made-up round number.
| Chance of a misdirected payment | Expected cost avoided (chance × $3,000) | Avoided − $10 |
|---|---|---|
| 0.17% | $5 | −$5 |
| 0.33% | $10 | $0 (break-even) |
| 1% | $30 | +$20 |
| 2% | $60 | +$50 |
The link pays at a 0.33% chance of a misdirected payment: $10 ÷ $3,000. For payoffs of any size, it is easily exceeded.
Send instructions through a secure portal or link, tell borrowers you will never change them by email and ask them to call you at a number they already trust before sending any large payment.
Making it routine
- Send instructions through a secure link.
- Tell borrowers you never change them by email.
- Ask them to call a number they trust before a large payment.
- Check the link works each quarter.
Run your own numbers
Use the free fix-and-flip loan sizer below to have the payoff figure ready when a borrower calls.