Septic or Sewer Hookup: The Years to Pay Back

By DeskTech HQ · · 1 min read

A house on septic has a hidden future cost: the system will need replacing. A house near a sewer main can connect, at a one-time cost and a monthly fee. The question is how long a connection takes to pay for itself, if ever.

The steps

  1. Septic cost per year = replacement cost ÷ life + yearly pumping and inspection.
  2. Sewer cost per year = the fee.
  3. Yearly saving from connecting = septic cost − sewer cost.
  4. Years to pay back = connection cost ÷ yearly saving (a septic inspection before an offer).

A worked example

Example (illustrative arithmetic, not quotes)

Replacing the septic system costs $22,000 and lasts 30 years, $733 a year. Pumping costs $150 a year. Septic: $883 a year. The sewer fee is $720 a year. Connecting costs $14,000. Every figure is a made-up round number.

Years after connecting Savings (years × $163) Savings − $14,000
10 $1,630 −$12,370
30 $4,890 −$9,110
86 $14,018 +$18

On running costs alone, the connection takes about 86 years to pay back: $14,000 ÷ $163. The sewer fee is almost as large as the septic cost it replaces.

So the case for connecting rests on other things: the municipality requires it, the septic system has failed and the replacement is due now, the lot cannot fit a new field, or a connected house sells better. If the system is sound and connection is optional, leaving it alone is usually cheaper (a sewer scope before an offer).

Making it routine

  1. Ask the municipality whether connection is required.
  2. Get an inspection of the septic system.
  3. Compute the yearly costs and the payback.
  4. Price the decision into your offer.

Run your own numbers

Use the free MAO calculator below to see how a one-time cost changes the price you can pay.

Quick answers

How do I compare them?

Convert each to a yearly cost, then divide the connection cost by the yearly saving.

What is in the yearly septic cost?

Replacement spread over its life, plus pumping and inspections.

What is in the sewer cost?

The monthly or yearly sewer fee. The connection cost is paid once.

Can I be required to connect?

Sometimes, by the municipality. Check locally.

Do the numbers in this guide apply to my property?

No. The costs are made up for the example. They are not quotes.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.