Set the First Rent-Increase Reminder for Month Ten

By DeskTech HQ · · 1 min read

A lease ends in two months and nobody has sent a renewal offer. The notice period for a rent change has already passed. A reminder at month ten takes three minutes to set. The question is how likely a missed notice window is for the reminder to pay.

The steps

  1. Price the reminder: minutes × the value of your time.
  2. Price a missed window: months at the old rent.
  3. Break-even chance = reminder cost ÷ missed-window cost.
  4. Review the rent first (annual rent review).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The reminder takes 3 minutes at $60 an hour: $3. A missed window costs $150 in rent not collected. Every figure is a made-up round number.

Chance of missing the notice window Expected cost avoided (chance × $150) Avoided − $3
1% $1.50 −$1.50
2% $3 $0 (break-even)
5% $7.50 +$4.50
10% $15 +$12

The reminder pays at a 2% chance of a missed notice window: $3 ÷ $150. Across several leases, it is plausible.

Put a reminder ten months after the start of each lease, look up the notice period in the lease and the law, review the rent and send the renewal offer in time. Check rent-control limits first.

Making it routine

  1. Put a reminder ten months after the lease starts.
  2. Look up the notice period in the lease and the law.
  3. Review the rent.
  4. Check rent-control limits first.

Run your own numbers

Use the free BRRRR calculator below to see how a rent change affects your returns on a hold.

Quick answers

Why month ten?

Notice periods and renewal offers often need to go out well before a lease ends.

How do I price the reminder?

The minutes to set it times the value of your time.

What does a missed window cost?

Months at the old rent because notice came too late.

What is the break-even chance?

The reminder's cost divided by that cost.

Do the numbers in this guide apply to my rental?

No. The dates, costs and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.