Spot-Check the Interest Accrual: The Error Odds
Interest accrual is the number everything else rests on. A wrong day count or a missed rate change repeats every month. Recomputing one loan by hand takes ten minutes. The question is how likely an error has to be for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Estimate the cost of an error left in place: correction work and money misstated.
- Break-even chance = cost ÷ error cost.
- Compare with how often your system has been wrong (monthly loan ledger reconciliation).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 10 minutes at $60 an hour: $10. An error left in place would cost $250. Every figure is a made-up round number.
| Monthly chance the accrual is wrong | Expected cost avoided (chance × $250) | Avoided − $10 |
|---|---|---|
| 2% | $5.00 | −$5.00 |
| 4% | $10.00 | $0 (break-even) |
| 8% | $20.00 | +$10.00 |
| 15% | $37.50 | +$27.50 |
The check pays at a 4% monthly chance of an error: $10 ÷ $250. Systems are usually right, so rotate loans: check a different one each month, and check any loan whose rate or terms changed.
If you find an error, correct it, tell the borrower and keep a record. Overcharges may need to be refunded, and the loan documents say how (the monthly ledger reconciliation).
Making it routine
- Pick a different loan each month.
- Recompute from balance, rate and days.
- Always check a loan after a rate or term change.
- Record the check and any correction.
Run your own numbers
Use the free fix-and-flip loan sizer below to recompute a loan’s interest and compare it with your ledger.