Tax Appeal: Contingency Fee or Flat Fee? The Savings
An appeal of a property tax assessment can be handled for a flat fee or for a share of the savings. A contingency fee costs nothing if the appeal fails. A flat fee costs the same whatever happens. The two cross at a level of savings.
The steps
- Take the contingency percentage and the flat fee.
- Crossing savings = flat fee ÷ percentage.
- Compare with the savings you expect and how likely the appeal is to succeed (tax appeal: cost vs savings).
A worked example
Example (illustrative arithmetic, not quotes)
The contingency fee is 30% of the first year’s savings. The flat fee is $350. Every figure is a made-up round number.
| First-year savings | 30% contingency fee | Flat fee | Cheaper |
|---|---|---|---|
| $600 | $180 | $350 | Contingency, by $170 |
| $1,167 | $350 | $350 | Even |
| $2,400 | $720 | $350 | Flat, by $370 |
The two cost the same at about $1,167 of savings: $350 ÷ 0.30. If you expect a big reduction, the flat fee costs less. If you expect a small one, or are unsure of winning, the contingency fee costs less, and nothing if you lose.
The chance of success changes the comparison. A flat fee is paid even if the appeal fails, so its true cost per appeal won is higher. If you think there is a 50% chance, the flat fee’s expected cost per win is $700. Weigh the odds as well as the amount (reassessment after a rehab).
Making it routine
- Note the appeal deadline for each property.
- Estimate the savings and the odds.
- Compare both fee structures.
- Confirm who may represent you.
Run your own numbers
Use the free BRRRR calculator below to see how a lower tax bill changes a rental’s cash flow.