Tell Borrowers Who to Call After Hours in an Emergency
A pipe bursts on a Saturday night at a property you hold a lien on. The borrower is out of town and does not know whose claim line to call. A short note in the closing package takes three minutes to add. The question is how likely an unreachable emergency is for the note to pay.
The steps
- Price the note: minutes × the value of your time.
- Price an unreachable emergency: extra damage while nobody knew who to call.
- Break-even chance = note cost ÷ emergency cost.
- Keep a plumber on call too (emergency plumber retainer).
A worked example
Example (illustrative arithmetic, not predictions)
The note takes 3 minutes at $60 an hour: $3. An unreachable emergency adds $500 in damage. Every figure is a made-up round number.
| Chance of an unreachable emergency | Expected cost avoided (chance × $500) | Avoided − $3 |
|---|---|---|
| 0.3% | $1.50 | −$1.50 |
| 0.6% | $3 | $0 (break-even) |
| 1.8% | $9 | +$6 |
| 3% | $15 | +$12 |
The note pays at a 0.6% chance of an unreachable emergency: $3 ÷ $500. With many properties and borrowers, it is plausible.
Tell borrowers to call emergency services first, then their insurer’s claim line, then you, and give the insurer’s number from the policy. Keep it consistent with the loan and insurance documents.
Making it routine
- Tell borrowers to call emergency services first.
- Give the insurer’s claim line from the policy.
- Give your own number last.
- Keep it consistent with the documents.
Run your own numbers
Use the free fix-and-flip loan sizer below to see what an insurance claim can mean for a loan.