Tell the Crew Where the Bathroom Is
The crew uses the house toilet while the plumbing is half done. It clogs with drywall dust and rags. Or they use a neighbor’s yard. A two-line rule at the start of the job takes three minutes to set. The question is how likely a clogged toilet or a complaint is for the rule to pay.
The steps
- Price the rule: minutes × the value of your time.
- Price a clogged toilet or complaint: a plumber visit, a mess or a neighbor call.
- Break-even chance = rule cost ÷ cost of a problem.
- Put it on the contact sheet (tape a contact sheet inside the kitchen cabinet).
A worked example
Example (illustrative arithmetic, not predictions)
The rule takes 3 minutes at $60 an hour: $3. A clogged toilet or complaint costs $150. Every figure is a made-up round number.
| Chance of a clog or complaint | Expected cost avoided (chance × $150) | Avoided − $3 |
|---|---|---|
| 1% | $1.50 | −$1.50 |
| 2% | $3 | $0 (break-even) |
| 5% | $7.50 | +$4.50 |
| 10% | $15 | +$12 |
The rule pays at a 2% chance of a clog or complaint: $3 ÷ $150. Over a flip with a crew of several, it is plausible.
Say in the kickoff and on the sheet whether the house toilet is usable, where else to go, such as a portable toilet, and what not to flush. Check local rules on site facilities.
Making it routine
- Say whether the house toilet is usable.
- Say where else to go.
- Say what not to flush.
- Check local rules on site facilities.
Run your own numbers
Use the free holding cost calculator below to see what a day of plumbing delay costs on your own flip.