Two-Step Sign-In on the Report-Sending Account: The Odds
Someone gets into the email account that sends investor reports and sends new wiring details to the whole list. Two-step sign-in takes fifteen minutes to turn on. The question is how likely a takeover is for the setup to pay.
The steps
- Price the setup: minutes × the value of your time.
- Price a takeover: fraud, cleanup and lost trust.
- Break-even chance = setup cost ÷ takeover cost.
- Pair it with wire checks (wire fraud prevention for lenders).
A worked example
Example (illustrative arithmetic, not predictions)
The setup takes 15 minutes at $60 an hour: $15. A takeover would cost $3,000. Every figure is a made-up round number.
| Chance of an account takeover | Expected cost avoided (chance × $3,000) | Avoided − $15 |
|---|---|---|
| 0.25% | $7.50 | −$7.50 |
| 0.5% | $15 | $0 (break-even) |
| 1% | $30 | +$15 |
| 2% | $60 | +$45 |
The setup pays at a 0.5% chance of a takeover: $15 ÷ $3,000. For an account that investors trust, it is easily exceeded.
Turn it on for the sending account and every account that can reset its password, keep backup codes somewhere safe, and tell investors that you will never change wiring details by email.
Making it routine
- Turn it on for the sending account.
- Cover accounts that can reset its password.
- Keep backup codes safe.
- Tell investors you never change wiring by email.
Run your own numbers
Use the free fix-and-flip loan sizer below to have your figures ready for the next report.