Verifying Borrower Cash Before Funding: The Odds
A lender who funds most of the deal counts on the borrower putting in the rest. If the cash is not there, the lender carries more risk than it thought. Checking costs a little. The question is how small the chance of a miss can be before checking still pays.
The steps
- Put a cost on verifying funds: staff time and any fee.
- Estimate the extra loss if the borrower’s cash turns out to be missing.
- Break-even chance = cost ÷ extra loss.
- Apply the same check to every applicant (verifying the entity and signers).
A worked example
Example (illustrative arithmetic, not predictions)
Verifying costs $40. If the cash is missing, the extra loss on the loan is $15,000. Every figure is a made-up round number.
| Chance the cash is missing | Expected loss avoided (chance × $15,000) | Avoided − $40 |
|---|---|---|
| 0.1% | $15 | −$25 |
| 0.27% | $40 | $0 (break-even) |
| 0.5% | $75 | +$35 |
| 1% | $150 | +$110 |
The check pays at odds of about 0.27%, or one borrower in 375: $40 ÷ $15,000. The bar is very low. Even a small chance of a shortfall justifies the check.
The value is also in what it prevents upstream. A borrower who has little skin in the deal is more likely to walk away from a troubled loan (personal guarantees). Treat verification as a standard step, not a judgment on any one borrower.
Making it routine
- Decide what proof you need, and write it down.
- Ask every applicant for the same thing.
- Store records securely and delete them on schedule.
- Note any shortfall before you fund.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how the borrower’s own cash changes the loan you can make.