Well Water Test Before an Offer: The Odds That Cover $120
A house on a private well has no utility behind it. Bacteria, nitrates and other contaminants can show up only in a test. A certified lab test costs about a hundred dollars. The question is how likely a problem is for the test to pay.
The steps
- Price the test: the lab fee.
- Estimate the cost of treating or replacing the supply.
- Break-even chance = fee ÷ treatment cost.
- Make the test a condition of your offer (septic inspection before you offer).
A worked example
Example (illustrative arithmetic, not predictions)
The test costs $120. Treating or replacing a bad supply would cost $6,000. Every figure is a made-up round number.
| Chance the well has a problem | Expected cost avoided (chance × $6,000) | Avoided − $120 |
|---|---|---|
| 1% | $60 | −$60 |
| 2% | $120 | $0 (break-even) |
| 5% | $300 | +$180 |
| 10% | $600 | +$480 |
The test pays at a 2% chance of a problem: $120 ÷ $6,000. For an old well near a field or a septic system, that is likely exceeded.
Use a certified lab, ask for the standard panel for your area, and look at the well’s depth, age, cap and pump. If the result is bad, price the treatment into your offer or walk. A clean result today does not guarantee tomorrow.
Making it routine
- Make a certified lab test a condition of the offer.
- Ask for the local standard panel.
- Look at the well’s age, depth and pump.
- Price any treatment into the offer.
Run your own numbers
Use the free MAO calculator below to see how a treatment cost changes the most you can offer.