The 70% Rule and MAO: When It Works and When It Does Not
The 70% rule is a shortcut for deciding how much to offer on a fix-and-flip. It says: pay no more than 70% of the after-repair value (ARV), minus the cost of repairs. It is quick, easy to remember and useful as a first screen. It is also easy to misuse, so it helps to know what it assumes and when to run the full numbers.
The formula
MAO (rule of thumb) = ARV × 70% − repairs
MAO stands for Maximum Allowable Offer: the most you can pay and still hit your target.
Example (illustrative arithmetic, not market data)
- ARV: $300,000
- Repairs: $45,000
- 70% of ARV: $210,000
- MAO = $210,000 − $45,000 = $165,000
The 30% left over is meant to cover everything else: buying costs, holding costs, selling costs and your profit.
A detailed MAO
The rule hides your real numbers inside that 30%. A detailed MAO makes them explicit:
MAO (detailed) = ARV − repairs − buying costs − holding costs − selling costs − desired profit − wholesale fee (if any)
Using the same deal with illustrative costs:
| Item | Amount |
|---|---|
| ARV | $300,000 |
| Repairs | −$45,000 |
| Buying costs | −$5,000 |
| Holding costs | −$8,000 |
| Selling costs (8% of ARV) | −$24,000 |
| Desired profit | −$30,000 |
| MAO (detailed) | $188,000 |
In this example the detailed method allows a higher offer ($188,000) than the rule ($165,000), because the costs and profit target in this example total less than the 30% the rule reserves. With heavier costs or a bigger profit target it would come out lower. The point is that the detailed number reflects your deal, and the rule does not.
You can try your own numbers in the MAO calculator, which shows both results side by side.
When the 70% rule works well
- As a fast first screen when you are looking at many properties
- In markets and deal types where the 30% roughly matches your costs and profit target
- For a quick check on whether a seller’s asking price is even in range
When it misleads
- Lower-priced properties. Some costs do not shrink with price, so a flat 30% can be too little.
- Large or slow rehabs. Longer timelines mean larger holding costs (what to count).
- Different financing. Higher points or interest change the math.
- Different selling costs. Commissions, closing costs and concessions vary by market.
- Wholesaling. The wholesaler’s fee has to come out of the same margin, so the end buyer’s price is not the same as the wholesaler’s offer.
- Uncertain ARV. If your ARV is a hope rather than a number supported by recent sales, every result is unreliable.
How to use it well
- Start with the rule to screen quickly.
- Build a real rehab budget (how).
- Run the detailed MAO with your actual costs and profit target.
- If the two disagree, trust the detailed one and find out why.
- Revisit the number if the rehab budget or the timeline changes.
If the maximum offer is negative, the deal does not work at those numbers, and no negotiation will change the arithmetic.