Your Offer Ladder: Opening, Target and Walk-Away Prices

By DeskTech HQ · · 2 min read

The seller counters at $180,000. You want the house. Is it a good price? If you set your walk-away price before the call, you already know, and the answer takes five seconds.

The steps

  1. Compute net proceeds = finished value × (1 − selling cost %).
  2. Everything but the purchase = rehab + buying costs + holding costs.
  3. Walk-away price = net proceeds − everything but the purchase − required profit (maximum allowable offer).
  4. Set a target a bit below it and an opening offer below that.
  5. Write the three prices down and check each against the profit rule.

A worked example

Example (illustrative arithmetic, not market data)

Finished value $300,000, selling costs 8%, rehab $55,000, buying costs $4,000, holding cost $7,800 and a required profit of $35,000 (sensitivity table). Every figure is a made-up round number.

  • Net proceeds: $300,000 × 0.92 = $276,000.
  • Everything but the purchase: $55,000 + $4,000 + $7,800 = $66,800.
  • Walk-away: $276,000 − $66,800 − $35,000 = $174,200.
Price Role Profit Return on cost
$160,000 Opening offer $49,200 21.7%
$170,000 Target $39,200 16.6%
$174,200 Walk-away $35,000 14.5%
$180,000 Seller’s counter $29,200 11.8%
$185,000 Asking price $24,200 9.6%

Every dollar of price is a dollar less profit. The $180,000 counter gives $29,200, $5,800 short of the rule. The reply is not “that’s a little high”; it is “my number is $174,200”, and you stop there. A seller who will not come down is not a seller you can profit from.

Check the ladder against a cautious value. If the finished value is 5% lower ($285,000), the walk-away falls to $160,400, a drop of $13,800 (comp adjustments). Build the ladder on the cautious number and treat the optimistic one as a bonus.

Using the ladder

  1. Share your opening offer, not your walk-away.
  2. Re-run the numbers if inspection or scope changes the rehab (walkthrough).
  3. Record each negotiation’s final price against the walk-away (buy box).
  4. Review the ladder when you lose a deal: was the walk-away right?

Run your own numbers

Use the free maximum allowable offer calculator below to compute the walk-away price for a deal you are looking at.

Quick answers

What is a walk-away price?

It is the highest price at which the deal still meets your profit rule. Above it, you decline the deal, whatever the seller says.

How is it different from the target price?

The target is where you hope to settle, with some profit above your minimum. The walk-away is the limit. The opening offer is lower still, to leave room to negotiate.

Should I set the prices before the negotiation?

Yes. Prices set in the heat of a counteroffer drift upward. Writing the ladder first makes each reply a comparison with a number, not a feeling.

What if my value estimate is too high?

The walk-away moves dollar for dollar with it, after selling costs. Build the ladder on a cautious value and check it against a lower one.

Do the numbers in this guide apply to my deals?

No. The values, costs and prices are made up for the example. They are not market data or advice about what to offer on any property.

Keep reading

Deal analysis

Ask the Seller Why They Are Selling: The Odds

Learn how to price a five-minute question to the seller about why they are selling and find the chance the answer changes your offer enough to pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.