Add a Dump Weight Overage Line to the Rehab Budget
Tile, plaster and concrete go into the dumpster, and the bill includes a weight overage no one budgeted for. Asking the hauler about the limit and the rate, and adding a line, takes three minutes. The question is how likely an overweight fee is for the line to pay.
The steps
- Price the step: minutes × the value of your time.
- Price an overweight fee: a per-ton charge or a swap that was not in the budget.
- Break-even chance = step cost ÷ fee cost.
- Plan debris first (dumpsters and debris budget before demolition).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 3 minutes at $60 an hour: $3. An overweight fee costs $200. Every figure is a made-up round number.
| Chance of an overweight fee | Expected cost avoided (chance × $200) | Avoided − $3 |
|---|---|---|
| 0.75% | $1.50 | −$1.50 |
| 1.5% | $3 | $0 (break-even) |
| 4.5% | $9 | +$6 |
| 7.5% | $15 | +$12 |
The step pays at a 1.5% chance of an overweight fee: $3 ÷ $200. When demolition includes heavy materials, it is easily exceeded.
Ask the hauler for the weight limit and the overage rate, estimate whether heavy debris is likely and add the line.
Making it routine
- Ask the hauler for the weight limit and overage rate.
- Estimate whether heavy debris is likely.
- Add the line to the budget.
- Ask about a separate container for heavy debris.
Run your own numbers
Use the free MAO calculator below to see how a larger rehab budget changes your maximum offer.