Ask About a Buried Oil Tank Before an Offer: The Odds

By DeskTech HQ · · 2 min read

A house that once burned oil may still have the tank in the ground, long after the furnace was changed. A leaking tank can cost tens of thousands. A question to the seller and a look for a fill pipe or vent pipe at the foundation takes ten minutes. The question is how likely a tank is for the question to pay.

The steps

  1. Price the question: minutes × the value of your time.
  2. Estimate the cost of a tank problem found late: testing, removal, cleanup.
  3. Break-even chance = cost ÷ tank-problem cost.
  4. Pair it with other environmental checks (lead paint test before an offer).

A worked example

Example (illustrative arithmetic, not predictions)

The question takes 10 minutes at $60 an hour: $10. A tank problem found late would cost $10,000. Every figure is a made-up round number.

Chance of a buried tank problem Expected cost avoided (chance × $10,000) Avoided − $10
0.05% $5 −$5
0.1% $10 $0 (break-even)
0.5% $50 +$40
2% $200 +$190

The question pays at a 0.1% chance of a tank problem: $10 ÷ $10,000. In an older neighborhood that once heated with oil, the chance is far higher.

Ask whether the house ever burned oil and whether a tank was removed or closed, with paperwork. Look for a fill pipe or vent pipe near the foundation, and make a tank sweep and any needed testing a condition of your offer. Get environmental and legal advice before you buy a property with a suspected tank.

Making it routine

  1. Ask if the house ever burned oil.
  2. Ask for paperwork on any removal or closure.
  3. Look for fill and vent pipes at the foundation.
  4. Make a tank sweep a condition of the offer.

Run your own numbers

Use the free MAO calculator below to see how a cleanup cost changes the most you can offer.

Quick answers

Why ask about oil tanks?

Old buried tanks can leak and cost a great deal to remove and clean up.

How do I price the question?

The minutes times the value of your time.

What is the break-even chance?

The cost divided by the cost of a tank problem.

How can I find out?

Ask the seller, look for a fill pipe or vent, and ask an inspector about a tank sweep.

Do the numbers in this guide apply to my deal?

No. The cost, loss and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.