Ask About Stormwater and Drainage Fees Before an Offer
A property with a big driveway and a flat roof can carry a yearly stormwater fee that the listing never mentions. A ten-minute look at the town’s utility page and the seller’s bills shows whether there is one. The question is how likely an unplanned fee is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Estimate the cost of an unplanned fee over the hold.
- Break-even chance = cost ÷ fee cost.
- Add it to your operating costs (utilities in the rent or billed separately).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 10 minutes at $60 an hour: $10. An unplanned fee over the hold would cost $2,500. Every figure is a made-up round number.
| Chance of an unplanned stormwater or drainage fee | Expected cost avoided (chance × $2,500) | Avoided − $10 |
|---|---|---|
| 0.2% | $5 | −$5 |
| 0.4% | $10 | $0 (break-even) |
| 1% | $25 | +$15 |
| 3% | $75 | +$65 |
The check pays at a 0.4% chance of an unplanned fee: $10 ÷ $2,500. In a town with a stormwater utility, the chance is close to certain.
Look for a stormwater or drainage line on the water bill or tax bill, and ask the town how the fee is set and whether there are credits for rain gardens or permeable paving. Add the yearly amount to your operating numbers, and check whether unpaid fees can become a lien.
Making it routine
- Look for a stormwater line on the bills.
- Ask the town how the fee is set.
- Ask about credits and appeals.
- Add the yearly amount to your numbers.
Run your own numbers
Use the free MAO calculator below to see how a higher yearly cost changes the most you can offer.