Ask for a Photo of Each Inspection Sign-Off
At the end of the job, no one can find the signed card for the framing inspection. The city has it on file, but a hunt costs days. Asking for a photo the day it is signed takes two minutes. The question is how likely a missing sign-off is for the step to pay.
The steps
- Price the step: minutes × the value of your time.
- Price a missing sign-off: a delay while someone hunts for proof an inspection passed.
- Break-even chance = step cost ÷ delay cost.
- Verify before the end too (final inspection sign-off before the final draw).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 2 minutes at $60 an hour: $2. A missing sign-off costs $400 in delay. Every figure is a made-up round number.
| Chance of a missing sign-off | Expected cost avoided (chance × $400) | Avoided − $2 |
|---|---|---|
| 0.25% | $1 | −$1 |
| 0.5% | $2 | $0 (break-even) |
| 1.5% | $6 | +$4 |
| 3% | $12 | +$10 |
The step pays at a 0.5% chance of a missing sign-off: $2 ÷ $400. With several inspections on a rehab, it is easily exceeded.
Ask for a photo of each sign-off the day it happens, file it by inspection and ask the city how to get a copy if one is missing.
Making it routine
- Ask for a photo of each sign-off the day it happens.
- File it by inspection.
- Ask the city how to get a copy of a missing one.
- Compare the photos to the permit list.