Final Inspection Sign-Off Before the Final Draw: The Odds
The contractor says the work is done and asks for the final draw. If the building department has not signed off, the work may not be done in the way that counts. Asking for the sign-off takes five minutes. The question is how likely a failing project is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Estimate the cost of paying the final draw on a project that fails final inspection.
- Break-even chance = check cost ÷ that cost.
- Pair it with the holdback (final draw: what to hold back).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 5 minutes at $60 an hour: $5. A failed final inspection after payment would cost $2,000. Every figure is a made-up round number.
| Chance the project fails final inspection | Expected cost avoided (chance × $2,000) | Avoided − $5 |
|---|---|---|
| 0.1% | $2 | −$3 |
| 0.25% | $5 | $0 (break-even) |
| 1% | $20 | +$15 |
| 3% | $60 | +$55 |
The check pays at a 0.25% chance of a failed final inspection: $5 ÷ $2,000. Projects with open permits fail final inspection more often than that.
Ask for the signed inspection card, the certificate of occupancy where required, or a letter from the building department, and check the permit number. Know that a sign-off shows code compliance, not quality, so keep your own inspection too.
Making it routine
- Ask for the final sign-off with the final draw request.
- Check the permit number.
- Keep your own inspection too.
- Follow the loan documents on when the final draw is due.
Run your own numbers
Use the free fix-and-flip loan sizer below to see the funds still held at the final draw.