A Simple Borrower Scorecard for Private Lenders
Every private lender decides, loan by loan, whether the borrower and the project are strong enough. A written scorecard does not make that decision for them. It makes the review consistent, so two similar requests are looked at the same way.
How a scorecard works
- Choose the factors the lender cares about and write them down.
- Give each factor a weight, with weights that add to 100%.
- Rate each request from 1 to 5 on each factor, using written guidelines for each rating.
- Multiply each rating by its weight and add the results.
- Compare the total with a cutoff the lender has set in advance.
Keep the factors to ones tied to the loan: the experience, the cash, the project and the plan to repay (a pre-funding checklist).
A worked example
Example (illustrative arithmetic, not a standard)
The factors, weights and ratings below are made up for the example. A cutoff of 3.5 out of 5 is also made up.
| Factor | Weight | Borrower A rating | A weighted | Borrower B rating | B weighted |
|---|---|---|---|---|---|
| Experience with similar projects | 30% | 4 | 1.20 | 2 | 0.60 |
| Cash on hand | 25% | 3 | 0.75 | 4 | 1.00 |
| Project and property quality | 25% | 5 | 1.25 | 3 | 0.75 |
| Plan to repay | 20% | 3 | 0.60 | 4 | 0.80 |
| Total | 100% | 3.80 | 3.15 |
Borrower A scores 3.80, above the example cutoff of 3.5. Borrower B scores 3.15, below it, which in this example would prompt a closer look or different terms and would not by itself be a decision. The strongest factor for B, cash on hand, still counts, and the experience rating pulls the score down.
Cautions
- Write the rating guidelines first. “3 means two completed projects” is clearer than a feel.
- Do not add factors after the fact to reach a result.
- Review the scorecard itself from time to time and see whether it matched how loans turned out.
- Keep a record of the ratings in the loan file (what a lender tracks after closing).
- Check the legal side. Fair-treatment and decision-record rules may apply, and an attorney can say how.
Test the exit as well
A score on the borrower is not a test of the plan to repay (how lenders review an exit plan).
Size the loan against the deal
Use the free loan sizer below to compare the loan with the property’s value.