Second Review on Large Loans: When a Second Look Pays
Underwriting is done by people, and people miss things. A second review on larger loans is an inexpensive way to catch some of what the first one misses. The question is how often an error has to turn up to cover the cost.
The steps
- Time a second review: the hours and their value.
- Estimate the loss from an error a second reviewer would catch (in-balance test).
- Divide the cost by the loss. That is the break-even chance of such an error.
- Compare it with how often errors turn up in your file audits.
- Set a written size threshold above which a second review applies (file audits).
A worked example
Example (illustrative arithmetic, not benchmarks)
A second review takes 2.5 hours at $60 an hour: $150. An error it would catch, such as a missed lien or an overstated value, would cost about $30,000. Every figure is a made-up round number.
| Chance a large loan has such an error | Expected loss (× $30,000) | Cost of the review | Net |
|---|---|---|---|
| 0.2% | $60 | $150 | −$90 |
| 0.5% | $150 | $150 | $0 |
| 2% | $600 | $150 | +$450 |
| Break-even | $150 ÷ $30,000 = 0.5% |
If one large loan in two hundred has an error of that size that a second reader would catch, the review pays. That is a low bar, and the larger the loan, the lower it gets, because the loss grows while the review cost does not. On a loan where an error would cost $100,000, the bar is 0.15%.
The same arithmetic says a second review is not worth it on a small loan, where the loss from a missed error is small. That is why a size threshold makes sense. Set it in writing, apply it to every loan above it, and record the result of each review. A second review done by feel, on some loans and not on others, is hard to defend and hard to learn from (loan exceptions log).
Making it routine
- Write the size threshold.
- Use a short checklist for the second reviewer.
- Record what each review found.
- Revisit the threshold when losses or file audits change.
Run your own numbers
Use the free fix-and-flip loan sizer below to see the size of the loans a threshold would cover.