Break-Even Occupancy: How Many Units Can Sit Empty?
A four-unit building is rented to the full. One tenant leaves. Does the building still pay for itself? Break-even occupancy answers that before it happens.
The steps
- Add up the potential rent with every unit rented.
- Add up the monthly operating costs: taxes, insurance, maintenance, utilities and management.
- Add the monthly loan payment.
- Divide costs plus loan payment by potential rent. That is the break-even occupancy.
- Convert it to units: how many can be empty (rental cash flow stress test).
A worked example
Example (illustrative arithmetic, not market data)
Four units at $1,200 each: potential rent $4,800 a month. Operating costs are $1,900 and the loan payment is $1,700. Costs plus loan payment: $3,600. Treat the costs as fixed. Every figure is a made-up round number.
Break-even occupancy: $3,600 ÷ $4,800 = 75%, which is three units rented of four.
| Occupied units | Rent collected | Less $3,600 | Monthly result |
|---|---|---|---|
| 4 (100%) | $4,800 | $3,600 | +$1,200 |
| 3 (75%) | $3,600 | $3,600 | $0 |
| 2 (50%) | $2,400 | $3,600 | −$1,200 |
One vacant unit takes the building to break-even, and two vacant units cost $1,200 a month. With only four units, one move-out is a large share of the income. That is why a reserve for vacancy matters more on a small building than on a large one, where one unit is a small share (vacancy allowance from your own history).
A lower break-even gives you more room. A bigger down payment, a lower rate, lower expenses or higher rents all push it down. Run the figure before you buy, and ask whether you could carry the property through a long vacancy (DSCR).
Making it routine
- Compute break-even occupancy for every rental you buy.
- Keep a reserve of several months of costs plus the loan payment.
- Recompute when expenses or the rate change.
- Compare with your actual vacancy history.
Run your own numbers
Use the free BRRRR calculator below to test occupancy and rent on your own building.