What a Tenant Turnover Really Costs a Rental Owner

By DeskTech HQ · · 2 min read

A rental analysis often shows one line for vacancy, such as 5% of rent. A real turnover is a bundle of costs that arrive at the same moment, and it is worth seeing them one at a time.

The costs of one turnover

  • Lost rent. The months the unit is empty.
  • Cleaning and paint. Getting the unit ready.
  • Repairs. Items found when the tenant leaves.
  • Leasing. Advertising, showings and screening, or a leasing fee.
  • Utilities. Bills the owner pays while the unit is empty.

These sit alongside the regular operating costs of a rental (rental expenses to count).

A worked example

Example (illustrative arithmetic, not market data)

Assume rent of $2,000 a month and one month of vacancy. Every figure is a made-up round number.

Cost Calculation Amount
Lost rent, one month given $2,000
Cleaning and paint given $800
Repairs given $700
Leasing fee, half a month’s rent 50% × $2,000 $1,000
Utilities while empty given $150
One turnover sum $4,650

Spread over the length of the stay, the cost per year changes a lot.

Average stay Calculation Cost per year Share of $24,000 annual rent
1 year $4,650 ÷ 1 $4,650 19.4%
2 years $4,650 ÷ 2 $2,325 9.7%

Retention versus turnover

Suppose a $50 a month rent reduction for a year would keep a tenant who would otherwise leave. The reduction costs 12 × $50 = $600, compared with $4,650 for a turnover, so keeping the tenant costs $4,050 less if the offer really changes the outcome. If the tenant would have stayed anyway, the $600 is simply given up.

How to use this

  1. Put a real turnover cost in the rental analysis, not only a vacancy percentage (the BRRRR method).
  2. Check how a longer or shorter stay changes cash flow (cash-on-cash return; DSCR).
  3. Fix small problems during the lease so they do not pile up at move-out.
  4. Track the actual cost of each turnover for the next estimate.

Run your own numbers

Use the free BRRRR calculator below to test vacancy and costs on your own rental.

Quick answers

What costs come with a tenant turnover?

Common ones are lost rent while the unit is empty, cleaning and paint, repairs, a leasing or marketing cost, and utilities the owner pays during the vacancy. Which apply depends on the property and the lease.

Why does vacancy matter in a rental analysis?

Rent is usually the property's only income. A month without a tenant means a month of costs without rent, so a turnover reduces the year's income as well as adding its own expenses.

How can an owner spread turnover cost over time?

Divide the cost of one turnover by the number of years a tenant typically stays. The longer the average stay, the smaller the cost per year.

Is it worth paying to keep a good tenant?

It can be, when the cost of keeping the tenant is smaller than the cost of a turnover. The comparison depends on the actual numbers and on whether the incentive changes the tenant's decision.

Do the numbers in this guide apply to my property?

No. The examples are illustrative arithmetic with round numbers, not market data. Costs vary by property, and landlord-tenant rules vary by state and city.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.