Cash Offer Discount: What a Fast Close Is Worth to a Seller
Two offers sit on the table: $208,000 financed, closing in about 45 days, and a lower cash offer closing in 14. The gap in price is easy to see. The value of the faster, surer close is harder, and it decides how low the cash offer can go and still win.
The steps
- Total the seller’s monthly carrying cost: taxes, insurance, utilities and loan interest (holding costs).
- Multiply by the extra months the financed offer takes.
- Estimate the chance the financed deal falls through and what that costs the seller in time and relisting (when a buyer falls through).
- Multiply the chance by the cost.
- Add the two. That is the most the price gap can be before the financed offer wins.
A worked example
Example (illustrative arithmetic, not market data)
The financed offer is $208,000 and closes in about 30 days longer than a cash offer. The seller carries $1,500 a month. If the financed deal falls through (a 10% chance, in this example), the seller loses about $6,000 in extra carrying and relisting. Every figure is a made-up round number.
| Item | Amount |
|---|---|
| Extra carrying cost, one month at $1,500 | $1,500 |
| Expected cost of a fall-through (10% × $6,000) | $600 |
| Value of the cash offer’s speed and certainty | $2,100 |
| Financed offer, adjusted ($208,000 − $2,100) | $205,900 |
A cash offer at $206,000 would leave the seller about $100 ahead of the financed offer on this arithmetic ($206,000 − $205,900). A cash offer at $205,000 would leave them $900 behind ($205,000 − $205,900). The discount a cash offer can carry here is about $2,100 off the financed price.
Each seller’s numbers are different. A seller with no loan and low carrying costs gets less from speed; one paying a bridge loan or facing a move date may value it more (comparing offers by net proceeds).
Your own maximum offer comes from the deal, not from what the seller will accept. If the cash offer you can afford is below the competing offer once the seller’s savings are counted, either find a better term to offer (a short inspection window, no repair requests) or pass (the 70% rule and MAO).
Making it routine
- Ask the seller’s agent about timing, carrying costs and other offers.
- Estimate the seller’s value of speed before you write the number.
- Compare it with your own maximum offer.
- Keep notes on which terms mattered in each negotiation.
Run your own numbers
Use the free MAO calculator below to check that your offer leaves the profit you need.