Change the Lockbox Code After Each Trade Finishes

By DeskTech HQ · · 1 min read

A tile setter finished three weeks ago. His code still opens the box, and a nephew helps himself to a stack of cabinets. Changing the code when each trade is paid takes three minutes. The question is how likely an unwanted return is for the change to pay.

The steps

  1. Price the change: minutes × the value of your time, per trade.
  2. Price an unwanted return: lost tools or materials and a dispute.
  3. Break-even chance = change cost ÷ cost of a return.
  4. Log keys too (keep a key log for every flip).

A worked example

Example (illustrative arithmetic, not predictions)

The change takes 3 minutes at $60 an hour: $3. An unwanted return costs $300. Every figure is a made-up round number.

Chance of an unwanted return per trade Expected cost avoided (chance × $300) Avoided − $3
0.5% $1.50 −$1.50
1% $3 $0 (break-even)
3% $9 +$6
5% $15 +$12

The change pays at a 1% chance of an unwanted return per trade: $3 ÷ $300. Across a flip with many trades, it is plausible.

Change the code when each trade is paid, tell only those still working and write the date in the key log. A new code is not a substitute for rekeying if a key was copied.

Making it routine

  1. Change the code when each trade is paid.
  2. Tell only those still working.
  3. Write the date in the key log.
  4. Rekey if a key was copied.

Run your own numbers

Use the free holding cost calculator below to see what a replacement delay costs on your own flip.

Quick answers

Why change the code?

A finished trade no longer needs access, and old codes get shared.

How do I price it?

The minutes per trade times the value of your time.

What does an unwanted return cost?

Lost tools or materials, damage and a dispute.

What is the break-even chance?

The change's cost divided by that cost.

Do the numbers in this guide apply to my flip?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Lockbox or In-Person Access for Contractors?

Learn how to compare the time saved by giving contractors lockbox access with the risk of loss from shared access, and the odds that favor meeting them.

· 2 min read
Flip project management

Ask for a Photo of Each Delivered Material Pallet

Learn how to price asking the contractor for a photo of each delivered material pallet and find the short-shipment chance at which two minutes pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.