Lockbox or In-Person Access for Contractors?
A flip has a dozen contractor visits, and each one needs someone to open the door. Meeting every trade on site protects the property and eats your week. A lockbox saves the trips and spreads the access around. The question is how likely a loss has to be before the trips are worth making.
The steps
- Count the visits a project needs your presence for.
- Value the time each takes, including travel.
- Price the lockbox.
- Subtract to find the net time saving.
- Divide by the loss you would bear if added access led to theft or damage. That is the break-even chance (insuring a vacant flip).
A worked example
Example (illustrative arithmetic, not statistics)
12 visits at 30 minutes each, at $60 an hour, cost 12 × $30 = $360. A lockbox costs $25. Net saving: $335. A loss from added access, such as stolen tools or fixtures, would cost about $1,500. Every figure is a made-up round number.
| Chance of a loss because of the lockbox | Expected loss (× $1,500) | Net saving | Lockbox vs in person |
|---|---|---|---|
| 10% | $150 | $335 | +$185 |
| 22.3% | $335 | $335 | $0 |
| 40% | $600 | $335 | −$265 |
| Break-even | $335 ÷ $1,500 = 22.3% |
The lockbox pays unless the chance of a loss from it is above about one in four and a half. For a house in a busy neighborhood with a trusted crew, the chance is likely lower. For a house in an area with theft, or one where tools and fixtures are stored, it may be higher. Visits are more valuable on days when something is delivered or decided, and the lockbox helps most for routine trips.
Reduce the risk, not just the cost. Use a code unique to the project, change it when the work ends, give each trade only what it needs and keep valuable items off site when no one is there. The time saved is real, but a loss on a project in its last weeks costs more than the dollars: it can also delay the sale (doing the work yourself).
Making it routine
- Use a unique code for each project.
- Change it when the last trade leaves.
- Log who has access.
- Record any loss and its cause.
Run your own numbers
Use the free holding cost calculator below to find the cost of a day of delay if something goes wrong.