Fixed or Adjustable on a Rental Loan: The Break-Even Rate

By DeskTech HQ · · 2 min read

An adjustable-rate loan starts cheaper but can move. A fixed loan costs more at the start and stays put. The test is simple: if the adjustable rate averages more than the fixed rate over your hold, the fixed loan was the cheaper one.

The steps

  1. Take the loan balance and your expected hold in years.
  2. Fixed cost = balance × fixed rate × years.
  3. Adjustable cost = balance × average adjustable rate × years.
  4. The break-even average adjustable rate is the fixed rate (fixed vs floating on a credit line).

A worked example

Example (illustrative arithmetic, not quotes or forecasts)

The balance is $150,000 (interest only, for simplicity), held 5 years. The fixed rate is 7.5%. The adjustable rate starts at 6.5%. Every figure is a made-up round number.

Average adjustable rate over the hold Savings vs fixed (balance × (7.5% − average) × 5)
6.5% $7,500 saved
7.0% $3,750 saved
7.5% $0 (break-even)
8.0% $3,750 more

The adjustable loan wins as long as its rate averages under 7.5% over five years. If it stays at 6.5% for two years and then rises to 8.0%, the average over five years is 7.4%, just under the fixed rate. If it rises to 8.5% instead, the average is 7.7% and the fixed loan wins. A slower climb, or a shorter hold, favors the adjustable loan. A faster one, or a longer hold, favors the fixed loan.

The caps tell you the worst case. A loan that can rise two points at a time and five over its life has a much wider range than one with a one-point cap. Test the cash flow at the cap, not just at the start rate (stress-testing the cash flow).

Making it routine

  1. Decide how long you will really hold the loan.
  2. Read the index, caps and prepayment terms.
  3. Test cash flow at the cap.
  4. Pick fixed when the cap case does not work.

Run your own numbers

Use the free BRRRR calculator below to see how a rate change moves a rental’s cash flow.

Quick answers

What is the break-even average rate?

The fixed rate. If the adjustable rate averages more than that over your hold, the fixed loan was cheaper.

Does the starting rate decide?

No. The average over the time you hold the loan does.

What are caps?

Limits on how far the rate can move at each adjustment and over the loan.

How long will I hold the loan?

That sets how much of the rate path matters. A short hold favors the adjustable.

Do the numbers in this guide apply to my loan?

No. The rates are made up for the example. They are not quotes or forecasts.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.