Fixed vs Floating Rate on a Lender's Credit Line

By DeskTech HQ · · 2 min read

A lender who funds loans with a credit line has a choice: a fixed rate that costs more at the start, or a floating rate that costs less now but can rise. Nobody knows where rates will go. What you can know is how far a floating rate has to rise before the fixed one would have been cheaper.

The steps

  1. Take the average balance drawn over the year.
  2. Fixed cost = balance × fixed rate.
  3. Floating cost = balance × the average floating rate over the year.
  4. Break-even rise = fixed rate − starting floating rate (if the balance is steady).
  5. Compare the break-even rise with how much the rate could realistically move, and with how long the money is actually drawn (the unused part of a credit line).

A worked example

Example (illustrative arithmetic, not quotes or forecasts)

The average balance drawn is $150,000 for a year. The fixed rate is 9.0%. The floating rate starts at 7.5%. Every figure is a made-up round number.

Average floating rate over the year Floating interest Fixed interest Floating minus fixed
7.5% (no rise) $11,250 $13,500 −$2,250 (floating cheaper)
8.5% (+1.0 point on average) $12,750 $13,500 −$750 (floating cheaper)
9.0% (+1.5 points on average) $13,500 $13,500 $0 (break-even)
9.5% (+2.0 points on average) $14,250 $13,500 +$750 (fixed cheaper)

The floating rate wins until its average over the year climbs 1.5 points above where it started. The choice is not about whether rates rise. It is about whether they rise by more than the gap, and for long enough.

Two things shift the answer. If the money is drawn for only a few months, the average rise needed over that period is the same but the dollars at stake are smaller, which favors the cheaper starting rate. If your loans are priced at fixed rates for borrowers, a floating cost of funds puts the squeeze on your spread when rates rise, and the fixed line may be worth its premium as insurance (a line of credit compared with hard money).

Look for caps, floors and fees in the agreement. A cap limits the damage; a floor limits the benefit if rates fall.

Making it routine

  1. Track the average balance you draw each year.
  2. Compute the break-even rise for each offer.
  3. Compare it with the spread you earn on your own loans.
  4. Revisit the choice at renewal.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how a change in your cost of funds changes what a loan earns.

Quick answers

What is the break-even rate rise?

The average rise in the floating rate over the year that makes its total interest equal to the fixed rate's.

Does the floating rate have to rise to lose?

It has to rise by more than the gap between the two starting rates, averaged over the time the money is drawn.

Can I predict the rate?

No. This guide does not forecast rates. It shows how much movement the choice can absorb.

What else matters?

Caps, floors, fees and how long the money is drawn. Read the loan agreement.

Do the numbers in this guide apply to my line?

No. The rates and balance are made up for the example. They are not quotes.

Keep reading

Private and hard money lending

Credit Line Size: What the Unused Part Costs You

Learn how to compare the fee a private lender pays on the unused part of a credit line with the loans a smaller line could cause it to miss.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.