A Weekly Checklist for Running a Flip Project

By DeskTech HQ · · 3 min read

Flip project management is the routine of keeping a rehab on schedule and on budget from the day you buy to the day you sell. Most flips that go wrong do not fail in one dramatic moment. They drift, week by week, because nobody was checking the same few things. A short, repeatable checklist fixes that. This one is organized by phase.

Before you buy

  • Confirm the scope with a written, room-by-room walkthrough and a priced budget (how to build one).
  • Check permits and rules: what work needs a permit, and whether the property has open permits or violations.
  • Confirm your financing and timeline: how long you can hold the property before costs hurt the deal, and what your lender requires for draws. If you are new to the lender side, see hard money vs private money loans.
  • Decide the exit: sell or rent. A rental exit has its own math (the BRRRR method).

Before construction starts

  • Written contracts with each contractor: scope, price, start and finish dates, payment schedule, and who supplies materials.
  • Proof of license and insurance where required, before anyone starts work.
  • A schedule with dependencies, not just dates: demolition before framing, rough-in before drywall, and so on.
  • Long-lead items ordered early: windows, cabinets and anything else that takes time to arrive.
  • A single place for photos, receipts, bids and change orders, so nothing lives only in someone’s text messages.
  • Baseline photos of every room and system before work begins.

Every week during the rehab

Pick a day and do the same review every week.

  1. Walk the site and take dated photos of each area.
  2. Compare progress to the schedule. Is each task where it should be? If not, what is blocking it?
  3. Compare spending to the budget. Look at budget, committed and paid for each line, and the forecast final cost.
  4. Review open change orders. Anything not in writing is not approved.
  5. Plan the next two weeks. What must be ordered, scheduled or decided this week so nobody is waiting?
  6. Check the holding clock. Every extra week adds interest, taxes, insurance and utilities (what to count).
  7. Approve payments only against completed work you have seen or had inspected.
  8. Send an update to partners or lenders if they expect one.

At each major milestone

  • Rough-in work (plumbing, electrical, HVAC) is inspected before it is covered.
  • Required permit inspections are scheduled and passed.
  • Photos are taken before drywall, flooring and other finishes hide the work.

Closeout

  • Punch list: walk the property room by room with the contractor and write down every remaining item.
  • Final payment only after the punch list is complete, with lien waivers or releases if your state and contracts use them.
  • Final photos for listing and for your records.
  • Collect warranties, manuals and permit sign-offs and keep them with the project file.
  • Clean, stage if appropriate, and list.

Warning signs

  • A contractor asking for payment ahead of the work
  • Work done without a written change order
  • A budget line that keeps moving without a note explaining why
  • Photos and receipts you cannot find
  • Nobody can say what happens next week

The point of a checklist is not to add paperwork. It is to make problems visible early, when they are still cheap to fix.

Quick answers

What is flip project management?

Flip project management is the work of running a fix-and-flip from purchase to sale: scoping the rehab, hiring contractors, controlling the schedule and budget, and getting the property listed and sold. Most of it is a routine of checking the same few things every week.

How often should I visit a flip project?

Visit whenever a milestone is reached or a payment is requested, and keep a regular rhythm even when nothing seems to be happening. Photos from each visit give you a record of progress and a basis for approving payments.

What should a weekly flip review cover?

Schedule against plan, budget against actual (including committed costs), open change orders, the next two weeks of work and anything blocking it, and what has to be decided or ordered this week.

When should I pay a contractor?

Tie payments to completed, inspected work rather than to dates. Agree the payment schedule in writing before work starts, and hold back a final portion until the punch list is done.

What is a punch list?

A punch list is the final list of small items to fix or finish before the project is complete, such as touch-up paint, a loose handle or a missing cover plate. Walk the property room by room and write each item down.

See DeskTech Deals →

Keep reading

Flip project management

Budget Check Frequency: Weekly or Monthly?

Learn how to compare the extra time a weekly rehab budget check takes with the overrun it can catch weeks sooner, and the odds that make weekly worthwhile.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.