Free Satellite Photo Check Each Quarter: The Odds
A free satellite or street image can show a collateral property from above: a roof, a lot, a new building. Looking takes five minutes. It shows only what was there when the image was taken. The question is how likely a visible problem is for the look to pay.
The steps
- Price the look: minutes × the value of your time.
- Estimate the loss if a visible problem went unnoticed for a quarter.
- Break-even chance = cost ÷ loss.
- Compare with how old the images are and what a visit costs (photo check at extension).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 5 minutes at $60 an hour: $5. A visible problem noticed too late would cost $2,000. Every figure is a made-up round number.
| Chance the image shows a problem | Expected loss avoided (chance × $2,000) | Avoided − $5 |
|---|---|---|
| 0.1% | $2 | −$3 |
| 0.25% | $5 | $0 (break-even) |
| 1% | $20 | +$15 |
| 3% | $60 | +$55 |
The look pays at a 0.25% chance of a visible problem: $5 ÷ $2,000. That is a low bar for a free check.
It is a screen, not an inspection. If an image looks wrong, follow up with a call or a visit. Remember that the image may be months or years old, and that what you cannot see from above, such as the inside, needs the photo check and the draw inspections.
Making it routine
- Look at each collateral property once a quarter.
- Note the image date.
- Follow up on anything odd with a call or visit.
- Log what you saw.
Run your own numbers
Use the free fix-and-flip loan sizer below to see what an unnoticed problem does to the loan-to-value on a property.