Photo Check at Extension: The Condition Odds

By DeskTech HQ · · 1 min read

When a borrower asks for more time, the lender decides whether to extend. The decision rests on what the property looks like now. A photo check costs little. The question is how likely the property is to have changed for the worse for the check to pay.

The steps

  1. Take the cost of a photo check.
  2. Estimate the loss from deterioration you did not see before extending.
  3. Break-even chance = cost ÷ loss.
  4. Compare with how often borrowers who ask for extensions have stalled (loan extensions).

A worked example

Example (illustrative arithmetic, not predictions)

A photo check costs $60. Unseen deterioration could cost $9,000. Every figure is a made-up round number.

Chance the property has deteriorated Expected loss avoided (chance × $9,000) Avoided − $60
0.2% $18 −$42
0.67% $60 $0 (break-even)
3% $270 +$210

The check pays at a 0.67% chance of problems: $60 ÷ $9,000. A borrower who is late and asking for more time is more likely than average to have run into trouble on the property. A check is cheap protection at that point.

Use the photos to compare with the plan. Is the work where the draw schedule says it should be? Are there signs of water, vandalism or abandonment? If so, an extension may need different terms, or a different decision (a mid-loan value check).

Making it routine

  1. Ask for a photo check with every extension request.
  2. Get access under the loan documents.
  3. Compare photos with the plan and the draws.
  4. Set terms based on what you see.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how a loss compares with the profit on an extension.

Quick answers

What is the break-even chance?

The cost of the photo check divided by the loss from deterioration you did not see.

Who takes the photos?

A local helper or inspector, or the borrower, with the borrower's permission.

What should I look for?

Progress against the plan, damage, vacancy and open permits.

Do I need permission?

Follow the loan documents and the borrower's permission.

Do the numbers in this guide apply to my loans?

No. The cost, loss and odds are made up for the example. They are not predictions.

Keep reading

Loan servicing

Annual Tax Status Check: The Missed-Lien Odds

Learn how to find the yearly chance of an unpaid property tax lien that makes a $45 tax status check on each performing loan worth running.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.