Keep a Dated Decision Log of Owner Selections
The contractor installs the tile the owner did not choose, or the owner remembers a different color. Nobody wrote it down. A dated log of selections takes eighteen minutes across a flip. The question is how likely a redo is for the log to pay.
The steps
- Price the log: minutes × the value of your time.
- Price a redo: materials and labor.
- Break-even chance = log cost ÷ redo cost.
- Start with the walk (walk the site with the contractor before the first draw).
A worked example
Example (illustrative arithmetic, not predictions)
The log takes 18 minutes at $60 an hour: $18. A redo costs $600. Every figure is a made-up round number.
| Chance of a selection redo | Expected cost avoided (chance × $600) | Avoided − $18 |
|---|---|---|
| 1.5% | $9 | −$9 |
| 3% | $18 | $0 (break-even) |
| 6% | $36 | +$18 |
| 10% | $60 | +$42 |
The log pays at a 3% chance of a redo: $18 ÷ $600. Across a flip with many selections, it is plausible.
Write each choice with the date, the product code and who chose it, send it to the contractor by text or email and ask for a thumbs-up. Put price changes in a change order.
Making it routine
- Write each choice with date and product code.
- Send it to the contractor.
- Ask for a reply.
- Put price changes in a change order.
Run your own numbers
Use the free holding cost calculator below to see what the delay from a redo costs on your own flip.