Knock on Two Neighbors' Doors: The Odds That Pay
Neighbors know what an inspection cannot show: the party house, the flooded yard, the dispute over the fence. Two short chats take about twenty minutes. The question is how likely they are to reveal something deal-changing for the visit to pay.
The steps
- Price the visit: minutes × the value of your time.
- Estimate the loss from a problem you would not otherwise learn of.
- Break-even chance = cost ÷ loss.
- Compare with how much you know about the street (second walkthrough before an offer).
A worked example
Example (illustrative arithmetic, not predictions)
Two chats take 20 minutes at $60 an hour: $20. A problem you would not otherwise learn of would cost $5,000. Every figure is a made-up round number.
| Chance a neighbor reveals a problem | Expected loss avoided (chance × $5,000) | Avoided − $20 |
|---|---|---|
| 0.2% | $10 | −$10 |
| 0.4% | $20 | $0 (break-even) |
| 1% | $50 | +$30 |
| 3% | $150 | +$130 |
The chats pay at a 0.4% chance of a deal-changing answer: $20 ÷ $5,000. That is a low bar.
Treat answers as leads, not facts. A neighbor may have a grudge or a wrong memory. If two say the same thing, check it with records or an inspector. Be polite, brief and honest about who you are (ask the city about street flooding).
Making it routine
- Introduce yourself and ask open questions.
- Ask about the street, not about people.
- Check anything you hear against records or an inspector.
- Compute the break-even chance for the deal.
Run your own numbers
Use the free MAO calculator below to see how a known problem changes the most you can offer.