Ask the City About Street Flooding: The Odds
A property can sit outside a flood zone and still collect water when the street drain backs up. The city often knows which streets call in. A call or an email takes a few minutes. The question is how likely a drainage problem has to be for the call to pay.
The steps
- Price the call: minutes × the value of your time.
- Estimate the loss from a drainage problem you did not know: cleanup, lower value, longer sale.
- Break-even chance = cost ÷ loss.
- Pair it with a flood zone check (flood zone insurance before you offer).
A worked example
Example (illustrative arithmetic, not predictions)
The call takes 15 minutes at $60 an hour: $15. A drainage problem you did not know about would cost $3,000. Every figure is a made-up round number.
| Chance the city knows of a problem | Expected loss avoided (chance × $3,000) | Avoided − $15 |
|---|---|---|
| 0.25% | $7.50 | −$7.50 |
| 0.5% | $15.00 | $0 (break-even) |
| 2% | $60.00 | +$45.00 |
| 5% | $150.00 | +$135.00 |
The call pays at a 0.5% chance of a known problem: $15 ÷ $3,000. For a low-lying street or a neighborhood with old storm drains, the chance is higher.
Ask about calls for street flooding, drain repairs and planned work, and look at the basement on the first rainy day if you can. The city may not have records for every street, so a clean answer proves little (sump pump battery backup).
Making it routine
- Call or email public works before you offer.
- Ask about flooding calls and drain work.
- Check flood maps separately.
- Compute the break-even chance for the deal.
Run your own numbers
Use the free MAO calculator below to see how a drainage repair changes the most you can offer.